Here is the change log history.

V2.0.1

  • Bug fixing : #555, #559, #560, #561, #562, #563, #564, #567, #569, #574, #575

 

V2.0.0

  • Document management is now included in Project'Or RIA
    • As always, it is kept easy to use
    • Documents are imported at version management  
    • Status is managed on each version, with workfow enabled
    • Id of version managed is several ways : evolutive (as Vx.y), chronological (as a date), sequential (as a number) or external (manually defined)
    • Easy lock and unlock document, to reserve editing
    • Direct download
  • Financial functionality :
    • Definition of billing type on project type
    • Several billing types defined : Fixed price, Time & Material, Caped Time & Material, Manual
    • Definition of blling terms (for fixed price)
    • Definition of Activity price (for Time & Material)
    • Management of bills 
    • Management of bill lines depending on billing type
    • Bill edition (template provided, to be apdated to your own needs)
  • User interface improvments :
    • Read only fileds are displays with visual status to point out they are readonly
    • All sections are collapsable, and status (collpsed or expanded) is restored at last status on each screen)
    • When dialog form is opened, use [CTRL]+S to save
    • Target date added to version in combo box display
    • On planning, collapsed status for groups is restored on each access and is reproduced as is in printed form
    • On real work input screen, collapsed status for groups is restored on each access and is reproduced as is in printed form
    • Description added to meetings
  • Improved controls :
    • Control of double input in delay for ticket definition
    • Control of double input in Mail on status change definition
    • Add planning rights management, to avoid having any resource being able to plan the project
  • Improved Admin functionalities :
    • Recalculate reference for any (or all) type of element
    • auto-relaunch cron (alert sender) on user connection if is was abnormaly ended (php stopped)
  • Bug fixing : #516, #502, #507, #523, #53&, #532, #534, #539, #541, #542, #543

V1.9.1

  • Bug fixing : #503, #511, #512, #515, #522

 

V1.9.0

  • Export the planning to MS-Project xml format
  • Export every list to CSV Format : likely to be opened in MS-Excel; likely to be-re-imported in Import functionality
  • Base copy of project to copy the entire structure of the project (activities, mielstones, links)
  • Add type of project
  • Specific type of project "Template", to be copied as new projet, visible for every project manager, without need of an affectation
  • Add direct access for "add" or "update" or "delete" to affectations from Project and from Resource
  • Add direct access to stored filters, in a tooltip list
  • Add new filter on dates with a generic date, such as <= today + 7 days (so filter is up to date every day)
  • Add a Reference for most items, provinding a unique numbering for each type, within a parametered format
  • Automatically create new affectation for Project Manager, when defined
  • Column "target version" added in Tickets list
  • Add attachments and notes on Projects
  • Add requestor to activities (similar ot Ticket requestor field)
  • Add target dates for version ("Enter Into Service" and "End")
  • Bug fixing : #457, #467, #471, #472 , #478, #481, #482, #483, #487, #491, #496

 

V1.8.3

  • Bug fixing : #468

 

V1.8.2

  • Bug fixing : #455, #456

 

V1.8.1

  • Bug fixing : #439, #445, #446, #447, #448, #449, #453

 

V1.8.0

  • Reminders and alerts
  • LDAP connectivity
  • Choose unit as days or hours for Real work imputation and / or work follow-up
  • Translation to spanish
  • Administration screen
  • Global parameter screen
  • User interface improvements
  • Automatic check of version upon last released version
  • Bug fixing : #400, #417, #418, #423, #424, #425, #426, #428, #429, #430, #436Bug fixing : #410, #415, #416

 

V1.7.2

  • Bug fixing : #410, #415, #416

 

V1.7.1

  • German translation for V1.7.0
  • Bug fixing : #402, #404

 

V1.7.0

  • Add calendar management :
    • a week day may be off,
    • a week-end day may be worked.
  • Add product an version Management.
    Possibility to store origin version on tickets, and target version on tickets, activities and milestones.
  • Possibility to assign contacts and users to projects, to provide a visibility corresponding to the profile rights.
  • Possibility to import expense.
  • Improved navigation : 
    • New menu bar, with quick access buttons,
    • history of consulted items, with possibility to navigate through it.
  • Add possibility to copy an item into a new one of another king (for instance copy a ticket as an activity).
  • Avoid sending email on copy of item : wait until first save.
  • Add origin management, with possibility to store origin when copying an item. So it is possible to store that an activity has a ticket as its origin.
  • New theme, used as defaut, with colors of web site.
  • Give choice (as user parameter) to print or pdf export into a new page or in a included frame.
  • Bug fixing #373, #375, #380, #386, #389, #391, #393, #395, #396, #397.


V1.6.2

  • Bug fixing #371, #372, #379.


V1.6.1

  • Bug fixing #342, #343, #346, #347, #348, #349, #351, #353, #354, #355, #356, #357, #358, #360, #361, #362, #363, #366.


V1.6.0

  • Improvement of Today Screen :
    - Add Questions, Meetings and Decisions in Projects summary
    - Add for each item a visual progress bar, depending on item status (open, done, closed)
  • Add expense Management :
    - Individual expense (travel cost, ...)
    - Project expense
  • Add "Search" functionality for combo lists : 
    - Display a "search" button next to the combo
    - Clic on "search" button displays the full selectable list of elements
    - If item is not found in the list, it is possible to directly create a new one ("New" button)
    - If combo is not empty, clic on "search" button will first display the detail of the item, with possible access to search list
  • Add quick search functionality, searching on any text field and on the id
  • New reports :
    - Resource availability plan
    - Detail of activity, per task, per user, per day
    - Expense reports
    - Global summary for Expense and Resource cost
  • Generalization of Export to PDF (for any print functionality)
  • Add possibility to attach files to Actions
  • Description field moved to bottom (to see other items if description is very long)
  • Limit Database update to "admin" :
    - When installing new version, connections are refused for non admin users
  • Bug fixing #304, #313, #318, #320, #322, #325, #326, #328, #329, #336, #337, #338.


V1.5.5

  • Bug fixing #312.


V1.5.4

  • Bug fixing #306, #308, #309.


V1.5.3

  • Bug fixing #302, #303, #304, #305, #306.


V1.5.2

  • Additions to Manual.
  • Add tag search in Manual.
  • Bug fixing #299, #300.


V1.5.1

  • Improved reports for PDF format.
  • Translation to German of V1.5 texts.
  • Additions to Manual.
  • Bug fixing #297.


V1.5.0

  • Add cost management:
    - Add notion of function (role).
    - Resource has default function (main function).
    - Daily cost is stored on Resource, for a given function.
    - Assignment to an activity uses function to get daily cost.
    - Real work allocation calculates global cost for activity and project. 
    - Cost is displayed face to work.
  • Add management of visibility of Cost and Work depending on profile.
  • Add Requestor to Ticket description (a Requestor is a Contact).
  • Extend possibility to automatically send email on status change to :
    - Requestor, 
    - Project Leader 
    - Fixed email list
  • Extend filter functionality to be able to sort result.
  • Improve of Workflow display :
    - Colums header is repeated before each line.
    - Line header is repeated as last column.
    - Added a graphical Workflow Diagram to display possible progress on status.
  • Add possibility to export Reports as PDF.
    This functionality is proposed as beta-test, some reports have to be adapted to be correctly display in PDF format.
  • Add possibility to store GUI behaviour as user parameter:
    - Show/Hide Menu.
    - Switched mode between list and detail.
    New behavior also includes possiblity to choose how to switch modes:
    - On mouse over the shrinked bar.
    - On click on the shrinked bar.
  • Improve language change : when changing language, screen is completely refreshed to be displayed using new language.
  • Display WBS on Project and Activity.
  • Add list of Affectations on Project description.
  • Add list of Affectations on Resource description.
  • Add list of Projects on Customer description.
  • Add Urgency in header for Tickets.
  • Bug fixing #287, #288, #289, #290.


V1.4.2

  • Bug fixing #238, #272.
  • Improve manual : new subjects, related topics links.


V1.4.1

  • Bug fixing #262, #263, #264, #265, #266.


V1.4.0

  • Online Manual. Hit [F1] to open Manual.
    This is the first version of manual, with generic information. Detail for each screen to come next.
    Contextual access if page corresponding to actual screen exists.
  • New language for interface : German.
    Thanks to Klaus for his work on translation.
  • Access right management for reports and real work input.
  • Activities ordering in Planning - Gantt view : just drap and drop the activity to move it.
  • Two new planning modes for activities : fixed duration, and regular in half days.
  • Hide/Show menu functionaity, with automatic show/hide.
  • Switched mode, to switch between list and detail, to have a "full screen" view of detail.
  • Add possibility to set a filter as default, to automatically retrieve it on each connection.
  • Limit parent activity list to the activities of the same project.
  • Limit responsible list to the resources affected to the project.
  • Add notion of contact, for customer contact, with full address.
  • Extension of import functionality to Project, Meetings, Decisions, Questions and Affectations.
  • Help on format for each import.
  • Linked elements are now selectable : it's possible to move from actions, risks ans issues through links.
  • Integration of Dojo 1.5 : fields are not truncated any more on the right.
  • 11 new color themes, with light color (pastel) and contrasted color.
  • Severity field added to issues.
  • Bug fixing #212, #231, #234, #236, #237, #238, #240, #241, #242, #246, #249, #252, #256, #259.


V1.3.1

  • Correction to have Project'Or RIA work when 'erro_log' function is disabled by provider.


V1.3.0

  • Graphical reports.
  • New reports for tickets summary.
  • New reports for workload summary.
  • New reports for work status summary.
  • New reports for planning data.
  • New reports for history access, including deleted items.
  • Add access right management for reports.
  • Add printing facility for imputation.
  • Add access restriction for imputations.
  • Rapid save with [ctrl]+'s'.
  • Improvement of due dates initialization.
  • Add possibility to set result mandatory on done items.
  • Add possibility to set description mandatory depending on type of items.
  • Add 'handled' status.
  • Add possibility to set responsible mandatory on handled items.
  • Improvement of configuration form.
  • Bug fixing #201, #210, #214, #221, #224, #225, #227, #228.
  • 1 new parameter defined, to set default theme (used on login page).


V1.2.1

  • Bug fixing #204, #208, #209.


V1.2.0

  • Meetings management.
  • Decisions management.
  • Questions management.
  • Automatic email generation on status change.
  • Planning calculation optimization.
  • Bug fixing #185, #191, #192.
  • 6 new parameters defined, for email management.


V1.1.0

  • Printable reports.
  • Possibility to print Gantt planning.
  • Possibility to print lists.
  • Bug fixing #180, #181, #182.


V1.0.1

  • Bug fixing #179.


V1.0.0

  • Name change : ProjectOr becomes Project'Or RIA, for Project Organizer Rich Internet Application.
    This will allow :
    - distinction with light products ;-)
    - easy finding in search engine, using 'projectorria' keyword.
  • Automatic parameters configuration screen at first run.
  • Advanced filter functionality.
  • On Today screen, summary of activities for connected user, with direct link to each item.
  • On Today screen, possibility to count done and closed items for projects summary.
  • Display of dates corresponding to locale, in every field (including lists).
  • Display number of elements in main list grid.
  • Improvement of copy functionality ; initialization of some data that should not be copied.
  • Add priority management for Actions.
  • Bug corrections #162, #163, #167, #170, #172, #173, #174, #175.


V0.9.0

  • Workflow management for status change limitation.
  • Lock closed elements (except status and 'closed' flag).
  • Minor bug corrections #157, #158, #159.


V0.8.1

  • Minor bug corrections #155, #156.


V0.8.0

  • Improvement in planning algorythm, taking into account resource capacity, resource affectation rate to project and resource assignment rate to activity.
  • Change closure management and add done status as checkbox.
  • Automatically update closure and done on status update.
  • Compute real start and end dates corresponding to work on the activity.
  • Add controls on delete request for an item to cancel the operation if dependant elements exist.
  • Remove week-ends in duration calculation so that duration is in work days.


V0.7.0

  • First Release Candidate version.
  • Add dependency management between Activities, Milestones and Projects.
  • Planning calculation taking into account dependencies.
  • Show dependencies on Gantt planning chart.
  • Add import functionality, to import elements from CSV files.
  • Show planned work on work follow-up screen.


V0.6.1, V0.6.2

  • Correction of issues appearing in hosted mode.


V0.6.0

  • Add management of assignment to activities.
  • Add workload follow-up.


V0.5.0

  • Add links between Actions, Issues and Risks.
  • Add link of Activity, Ticket or Milestone to parent Activity (hierarchic level management).


V0.4.0

  • Add Team element to gather resources.
  • Increase performance (loading time highly reduced).


V0.3.0

  • Add work follow-up : Tickets, Activities, Milestones.
  • Add planning display as Gantt chart.
  • Add message management.


V0.2.0

  • Add rights access management at Project level, completely customizable.
  • Improved adaptability of detail display to fit window size.
  • Few bugs correction (including incorrect menu indentation)


V0.1.0

  • First version, to implement technical elements.
    This version is limited to some parameters and Risk Management Plan : Risks, Actions and Issues Management.
 
 
 
 
 

Joomla Templates by Joomla51.com