Here is the change log history.
V2.0.1
- Bug fixing : #555, #559, #560, #561, #562, #563, #564, #567, #569, #574, #575
V2.0.0
- Document management is now included in Project'Or RIA
- As always, it is kept easy to use
- Documents are imported at version management
- Status is managed on each version, with workfow enabled
- Id of version managed is several ways : evolutive (as Vx.y), chronological (as a date), sequential (as a number) or external (manually defined)
- Easy lock and unlock document, to reserve editing
- Direct download
- Financial functionality :
- Definition of billing type on project type
- Several billing types defined : Fixed price, Time & Material, Caped Time & Material, Manual
- Definition of blling terms (for fixed price)
- Definition of Activity price (for Time & Material)
- Management of bills
- Management of bill lines depending on billing type
- Bill edition (template provided, to be apdated to your own needs)
- User interface improvments :
- Read only fileds are displays with visual status to point out they are readonly
- All sections are collapsable, and status (collpsed or expanded) is restored at last status on each screen)
- When dialog form is opened, use [CTRL]+S to save
- Target date added to version in combo box display
- On planning, collapsed status for groups is restored on each access and is reproduced as is in printed form
- On real work input screen, collapsed status for groups is restored on each access and is reproduced as is in printed form
- Description added to meetings
- Improved controls :
- Control of double input in delay for ticket definition
- Control of double input in Mail on status change definition
- Add planning rights management, to avoid having any resource being able to plan the project
- Improved Admin functionalities :
- Recalculate reference for any (or all) type of element
- auto-relaunch cron (alert sender) on user connection if is was abnormaly ended (php stopped)
- Bug fixing : #516, #502, #507, #523, #53&, #532, #534, #539, #541, #542, #543
V1.9.1
- Bug fixing : #503, #511, #512, #515, #522
V1.9.0
- Export the planning to MS-Project xml format
- Export every list to CSV Format : likely to be opened in MS-Excel; likely to be-re-imported in Import functionality
- Base copy of project to copy the entire structure of the project (activities, mielstones, links)
- Add type of project
- Specific type of project "Template", to be copied as new projet, visible for every project manager, without need of an affectation
- Add direct access for "add" or "update" or "delete" to affectations from Project and from Resource
- Add direct access to stored filters, in a tooltip list
- Add new filter on dates with a generic date, such as <= today + 7 days (so filter is up to date every day)
- Add a Reference for most items, provinding a unique numbering for each type, within a parametered format
- Automatically create new affectation for Project Manager, when defined
- Column "target version" added in Tickets list
- Add attachments and notes on Projects
- Add requestor to activities (similar ot Ticket requestor field)
- Add target dates for version ("Enter Into Service" and "End")
- Bug fixing : #457, #467, #471, #472 , #478, #481, #482, #483, #487, #491, #496
V1.8.3
V1.8.2
V1.8.1
- Bug fixing : #439, #445, #446, #447, #448, #449, #453
V1.8.0
- Reminders and alerts
- LDAP connectivity
- Choose unit as days or hours for Real work imputation and / or work follow-up
- Translation to spanish
- Administration screen
- Global parameter screen
- User interface improvements
- Automatic check of version upon last released version
- Bug fixing : #400, #417, #418, #423, #424, #425, #426, #428, #429, #430, #436Bug fixing : #410, #415, #416
V1.7.2
- Bug fixing : #410, #415, #416
V1.7.1
- German translation for V1.7.0
- Bug fixing : #402, #404
V1.7.0
- Add calendar management :
- a week day may be off,
- a week-end day may be worked.
- Add product an version Management.
Possibility to store origin version on tickets, and target version on tickets, activities and milestones.
- Possibility to assign contacts and users to projects, to provide a visibility corresponding to the profile rights.
- Possibility to import expense.
- Improved navigation :
- New menu bar, with quick access buttons,
- history of consulted items, with possibility to navigate through it.
- Add possibility to copy an item into a new one of another king (for instance copy a ticket as an activity).
- Avoid sending email on copy of item : wait until first save.
- Add origin management, with possibility to store origin when copying an item. So it is possible to store that an activity has a ticket as its origin.
- New theme, used as defaut, with colors of web site.
- Give choice (as user parameter) to print or pdf export into a new page or in a included frame.
- Bug fixing #373, #375, #380, #386, #389, #391, #393, #395, #396, #397.
V1.6.2
- Bug fixing #371, #372, #379.
V1.6.1
- Bug fixing #342, #343, #346, #347, #348, #349, #351, #353, #354, #355, #356, #357, #358, #360, #361, #362, #363, #366.
V1.6.0
- Improvement of Today Screen :
- Add Questions, Meetings and Decisions in Projects summary
- Add for each item a visual progress bar, depending on item status (open, done, closed)
- Add expense Management :
- Individual expense (travel cost, ...)
- Project expense
- Add "Search" functionality for combo lists :
- Display a "search" button next to the combo
- Clic on "search" button displays the full selectable list of elements
- If item is not found in the list, it is possible to directly create a new one ("New" button)
- If combo is not empty, clic on "search" button will first display the detail of the item, with possible access to search list
- Add quick search functionality, searching on any text field and on the id
- New reports :
- Resource availability plan
- Detail of activity, per task, per user, per day
- Expense reports
- Global summary for Expense and Resource cost
- Generalization of Export to PDF (for any print functionality)
- Add possibility to attach files to Actions
- Description field moved to bottom (to see other items if description is very long)
- Limit Database update to "admin" :
- When installing new version, connections are refused for non admin users
- Bug fixing #304, #313, #318, #320, #322, #325, #326, #328, #329, #336, #337, #338.
V1.5.5
V1.5.4
- Bug fixing #306, #308, #309.
V1.5.3
- Bug fixing #302, #303, #304, #305, #306.
V1.5.2
- Additions to Manual.
- Add tag search in Manual.
- Bug fixing #299, #300.
V1.5.1
- Improved reports for PDF format.
- Translation to German of V1.5 texts.
- Additions to Manual.
- Bug fixing #297.
V1.5.0
- Add cost management:
- Add notion of function (role).
- Resource has default function (main function).
- Daily cost is stored on Resource, for a given function.
- Assignment to an activity uses function to get daily cost.
- Real work allocation calculates global cost for activity and project.
- Cost is displayed face to work.
- Add management of visibility of Cost and Work depending on profile.
- Add Requestor to Ticket description (a Requestor is a Contact).
- Extend possibility to automatically send email on status change to :
- Requestor,
- Project Leader
- Fixed email list
- Extend filter functionality to be able to sort result.
- Improve of Workflow display :
- Colums header is repeated before each line.
- Line header is repeated as last column.
- Added a graphical Workflow Diagram to display possible progress on status.
- Add possibility to export Reports as PDF.
This functionality is proposed as beta-test, some reports have to be adapted to be correctly display in PDF format.
- Add possibility to store GUI behaviour as user parameter:
- Show/Hide Menu.
- Switched mode between list and detail.
New behavior also includes possiblity to choose how to switch modes:
- On mouse over the shrinked bar.
- On click on the shrinked bar.
- Improve language change : when changing language, screen is completely refreshed to be displayed using new language.
- Display WBS on Project and Activity.
- Add list of Affectations on Project description.
- Add list of Affectations on Resource description.
- Add list of Projects on Customer description.
- Add Urgency in header for Tickets.
- Bug fixing #287, #288, #289, #290.
V1.4.2
- Bug fixing #238, #272.
- Improve manual : new subjects, related topics links.
V1.4.1
- Bug fixing #262, #263, #264, #265, #266.
V1.4.0
- Online Manual. Hit [F1] to open Manual.
This is the first version of manual, with generic information. Detail for each screen to come next.
Contextual access if page corresponding to actual screen exists.
- New language for interface : German.
Thanks to Klaus for his work on translation.
- Access right management for reports and real work input.
- Activities ordering in Planning - Gantt view : just drap and drop the activity to move it.
- Two new planning modes for activities : fixed duration, and regular in half days.
- Hide/Show menu functionaity, with automatic show/hide.
- Switched mode, to switch between list and detail, to have a "full screen" view of detail.
- Add possibility to set a filter as default, to automatically retrieve it on each connection.
- Limit parent activity list to the activities of the same project.
- Limit responsible list to the resources affected to the project.
- Add notion of contact, for customer contact, with full address.
- Extension of import functionality to Project, Meetings, Decisions, Questions and Affectations.
- Help on format for each import.
- Linked elements are now selectable : it's possible to move from actions, risks ans issues through links.
- Integration of Dojo 1.5 : fields are not truncated any more on the right.
- 11 new color themes, with light color (pastel) and contrasted color.
- Severity field added to issues.
- Bug fixing #212, #231, #234, #236, #237, #238, #240, #241, #242, #246, #249, #252, #256, #259.
V1.3.1
- Correction to have Project'Or RIA work when 'erro_log' function is disabled by provider.
V1.3.0
- Graphical reports.
- New reports for tickets summary.
- New reports for workload summary.
- New reports for work status summary.
- New reports for planning data.
- New reports for history access, including deleted items.
- Add access right management for reports.
- Add printing facility for imputation.
- Add access restriction for imputations.
- Rapid save with [ctrl]+'s'.
- Improvement of due dates initialization.
- Add possibility to set result mandatory on done items.
- Add possibility to set description mandatory depending on type of items.
- Add 'handled' status.
- Add possibility to set responsible mandatory on handled items.
- Improvement of configuration form.
- Bug fixing #201, #210, #214, #221, #224, #225, #227, #228.
- 1 new parameter defined, to set default theme (used on login page).
V1.2.1
- Bug fixing #204, #208, #209.
V1.2.0
- Meetings management.
- Decisions management.
- Questions management.
- Automatic email generation on status change.
- Planning calculation optimization.
- Bug fixing #185, #191, #192.
- 6 new parameters defined, for email management.
V1.1.0
- Printable reports.
- Possibility to print Gantt planning.
- Possibility to print lists.
- Bug fixing #180, #181, #182.
V1.0.1
V1.0.0
- Name change : ProjectOr becomes Project'Or RIA, for Project Organizer Rich Internet Application.
This will allow :
- distinction with light products ;-)
- easy finding in search engine, using 'projectorria' keyword.
- Automatic parameters configuration screen at first run.
- Advanced filter functionality.
- On Today screen, summary of activities for connected user, with direct link to each item.
- On Today screen, possibility to count done and closed items for projects summary.
- Display of dates corresponding to locale, in every field (including lists).
- Display number of elements in main list grid.
- Improvement of copy functionality ; initialization of some data that should not be copied.
- Add priority management for Actions.
- Bug corrections #162, #163, #167, #170, #172, #173, #174, #175.
V0.9.0
- Workflow management for status change limitation.
- Lock closed elements (except status and 'closed' flag).
- Minor bug corrections #157, #158, #159.
V0.8.1
- Minor bug corrections #155, #156.
V0.8.0
- Improvement in planning algorythm, taking into account resource capacity, resource affectation rate to project and resource assignment rate to activity.
- Change closure management and add done status as checkbox.
- Automatically update closure and done on status update.
- Compute real start and end dates corresponding to work on the activity.
- Add controls on delete request for an item to cancel the operation if dependant elements exist.
- Remove week-ends in duration calculation so that duration is in work days.
V0.7.0
- First Release Candidate version.
- Add dependency management between Activities, Milestones and Projects.
- Planning calculation taking into account dependencies.
- Show dependencies on Gantt planning chart.
- Add import functionality, to import elements from CSV files.
- Show planned work on work follow-up screen.
V0.6.1, V0.6.2
- Correction of issues appearing in hosted mode.
V0.6.0
- Add management of assignment to activities.
- Add workload follow-up.
V0.5.0
- Add links between Actions, Issues and Risks.
- Add link of Activity, Ticket or Milestone to parent Activity (hierarchic level management).
V0.4.0
- Add Team element to gather resources.
- Increase performance (loading time highly reduced).
V0.3.0
- Add work follow-up : Tickets, Activities, Milestones.
- Add planning display as Gantt chart.
- Add message management.
V0.2.0
- Add rights access management at Project level, completely customizable.
- Improved adaptability of detail display to fit window size.
- Few bugs correction (including incorrect menu indentation)
V0.1.0
- First version, to implement technical elements.
This version is limited to some parameters and Risk Management Plan : Risks, Actions and Issues Management.